Central (Puncak Alam, Selangor) & Northern (Penang)
CIDB & SPAN Compliant 36 Months Leakage Warranty

Project Track Record

Proven Execution Across Malaysian Industries

Nuritech Engineering has delivered hundreds of successful water tank installations, refurbishments, and HDPE lining projects for government ministries, universities, hospitals, multinational factories, and high-rise condominiums.

Pressed Steel Tank Refurbishment
Refurbishment & Realignment

Pressed Steel Sectional Tank Overhaul

Location: Commercial Complex, Penang
Scope: Dismantle stays, install new 2.0mm HDPE lining, align panels, and pressure test.

HDPE Geomembrane Relining
HDPE Lining

Concrete Reservoir Waterproofing

Location: Industrial Estate, Selangor
Scope: Food-grade 2.0mm HDPE relining with double hot-wedge weld and spark testing.

FRP Sectional Panel Installation
New Installation

Rooftop FRP Sectional Panel Tank

Location: Educational Campus, Perak
Scope: Turnkey supply, assembly, external structural steel skid, and overflow manifold.

Hospital Healthcare Water Tank
Healthcare & Government

Hospital Water Storage Refurbishment

Location: Hospital Complex, Northern Region
Scope: Internal stay replacement, sanitization, and SPAN potable water compliance handover.

Condominium Water Tank
High-Rise Residential

Suction & Break Water Tank Rehabilitation

Location: Condominium JMB, Klang Valley
Scope: Elimination of persistent joint leakage, gasket renewal, 36-month warranty.

Industrial Manufacturing Tank
Manufacturing

Manufacturing Plant Process Water Tank

Location: Industrial Park, Kedah
Scope: High-capacity pressed steel refurbishment executed within tight scheduled shutdown.

Standard Project Execution Methodology

Every refurbishment and lining project undertaken by Nuritech follows rigorous quality control steps:

01

Mobilization & Safety Setup

Site safety briefing, confined space entry compliance, exhaust ventilation, and equipment mobilization to rooftop or basement.

02

Dismantling & Surface Prep

Dismantling defective covers, internal rusted bracket stays, scraping degraded joints, and thorough surface washing.

03

HDPE Relining & Alignment

Installation of food-grade 2.0mm HDPE lining, double-wedge thermal extrusion welding, and realigning tank panels.

04

Re-assembly & Cover Renewal

Installation of brand new internal bracket stays, re-attaching panels, and installing new protective tank covers.

05

Hydrostatic Backfill Test

Filling tank to full operational capacity to inspect joint seals, seams, and nozzles under hydrostatic pressure.

06

36-Month Warranty Handover

Formal handover documentation, water tightness certification, and issuance of our official 3-year warranty.

Planning a Water Tank Refurbishment or Replacement Project?

Consult with our engineers to schedule an on-site structural integrity audit.